PROJECT AT JIN-YANG FACTORY WITH POWER OF 422 KWP, GIANG ĐIEN INDUSTRIAL PARK - ĐONG NAI
Total Power  
Investor CME Solar
EPC Contractor EPC Solar INS
Construction Partner Hung Phat Mechanical and Electrical Company
Installation location Jin-Yang Factory, Giang Đien Industrial Park, Đong Nai
Installation Equipment

Solar Panel: Longi Mono - 435 Wp, 445 kWp

On-grid Inverter Sungrow 110CX

Aluminum frame system and installation accessories VIMETCO.

 

422 kWp project at Jin - Yang factory, Giang Dien - Dong Nai industrial park

In March 2021, Solar INS was proud to successfully energize Jin-Yang rooftop solar power project in Giang Dien industrial park with a capacity of 422kWp.

Investment Opportunities
Like other factories in the industrial park, the Jin-Yang factory sees benefits from using renewable energy sources. Therefore, they choose CME Solar as the solar system investor to sell power to the plant and Solar INS as the contractor to provide solutions, equipment, and full-package construction of the rooftop solar power system.
Challenges

The plant's decision to install the system at the end of FIT2 also makes it difficult to connect because the Dong Nai area is under the management of EVN SPC and the corporation has not yet issued new instructions on bidding procedures for a self-consumed purpose.

In addition, the rooftop solar system must fully meet the legal requirements as well as fire protection regulations, and other safety regulations of the Industrial Park Management Board.

 
Effective solution

With previous experience in implementing Zero - export projects, the design, and installation of rooftop solar power systems for Jin - Yang factory was carried out quickly and easily.

At the same time, Solar INS also sent an official dispatch and met with Giang Dien Electricity and the Management Board of Giang Dien Industrial park to explain the principle of the Zero - export solar system and to strictly implement the spirit of encouraging self-use proposed by the EVN delegation.

Solar INS selected Huawei's monitoring and tracking equipment and solutions to deploy for this project. Solar INS is proud to be the pioneer in applying the Zero-export solutions.

 
Project completion

The project, after energizing and officially putting into operation in early April, has met the expectations of the investor and Jin-Yang factory manager, in terms of technical quality, efficiency, and power output. At the same time, it also solves all the challenges posed.

 
The outstanding performance of the project
Average energy yield 1.3 GWh/year
Reducing CO2 emissions by more than 0.4 tons/year - Equivalent to planting more than 70,000 new trees
The payback period is only 5 years.